Laying resin over an existing drive or path

A resin finish can go on top of a drive, path or patio that is already there. Quotes for the work name one of two kinds, resin bonded or resin bound.

Bonded or bound

Wikipedia's entry on resin-bound paving sets out how the two are laid. For a resin-bonded finish, a thin coat of resin goes down first and loose stone is scattered over it.

For a resin-bound finish, the stone and the resin are mixed together before laying, so every stone ends up coated. The same entry calls the bound kind permeable and the bonded kind impermeable.

If a quote names neither, ask the installer which one it is for.

The old surface underneath

The government's front-garden paving guidance has a short passage on changing a drive that is already laid. It says an existing drive can be converted to let water through, or to drain to a rain garden.

The same passage suggests asking a builder first, since the drive may also carry rainwater from the roof. With a new top going over old tarmac or concrete, a fair question for the installer is where the rain will run once the work is finished.

Replacing a front surface in England

In England, Class F of the General Permitted Development Order 2015 treats laying a hard surface at a house, or replacing one in whole or in part, as permitted development. So a planning application isn't needed, provided its conditions are met.

One condition covers the ground in front of the house. It applies where the surface lies between the front wall (the Order says the principal elevation) and a road, and where the ground covered, "or the area of hard surface replaced", would be more than 5 square metres. Then the surface has to be made of porous materials, or the water running off it has to be directed to a permeable or porous area within the property.

The government's guidance gives the other side. Laying a traditional drive that water can't pass through, over more than 5 square metres and with nowhere permeable for the water to run, needs planning permission.

If you aren't sure where your own plans fall, you can ask your council's planning team before the work starts.

Replacing a front surface in Wales

Wales has its own Class F, in the 1995 Order as amended in 2013. Its condition covers a hard surface in front of the house, between the front wall and a road.

The 5 square metre limit appears in the part about a replaced surface. That part also counts any area replaced in the six months before without meeting the condition.

Where the condition applies, the surface must be porous or permeable, or drain to a porous or permeable area within the property. It must then be kept that way permanently.

A quote agreed at your door

When you agree a contract with a trader face to face, somewhere other than the trader's business premises, it counts as an off-premises contract under the Consumer Contracts Regulations 2013. Under regulation 29, you can cancel it within the cancellation period without giving a reason.

The cancellation period is 14 days. When it starts depends on whether the contract counts as a service or as a sale of goods, so check the cancellation information the trader has to give you before you agree.